TY - BOOK ED - Pasific Industrial & Mining Sd. Bhd. TI - Contruction of tubewells for groundwater extraction at 5th mile Gambang Road, Kuantan PY - 1981/// KW - Hydrogeology KW - Gambang KW - Pahang N2 - The purpose and scope of investigation was to locate a suitable sand aquifer in the unconsolidated alluvium and develop its ground water potential so as to provide a filtered and bacteriologically free potable water having a combined design capacity of 40,000 gph from two production bores ER -