A preliminary geological report on the proposed Sg. Piah hydro-electric project Ulu Perak no. E(f)3/1983
Salim Suratman
- 1983
- 24 p. ill. 30 cm + 2 maps
Includes bibliographical references
This report has been prepared as a geological reconnaissance survey of a proposed tunnel line for the Lembaga Letrik Negara Sg Piah hydro-electric project. The proposed tunnel line is approximately 16.5 km long and comprises 2 stages of diversion and power tunnels