Yusuf Bujang
Report of hydrogeological investigation at Kpg. Kejapil, Bekenu district, Miri division, Sarawak GSKL 037/23/(318)
Yusuf Bujang, Mohd. Zailon Ramli
- 1998
- 7 p. ill., map 30 cm
A 4@ diameter tube well with depth 120 m into Lambir Formation was able to discharge water at about 3.0 m3/hr
Hydrogeology--Miri--Sarawak