TY - BOOK AU - Yusuf Bujang AU - Mohd. Zailon Ramli TI - Report of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak PY - 1998/// KW - Hydrogeology KW - Miri KW - Sarawak N1 - Includes bibliographical references N2 - A 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period ER -