Yusuf Bujang

Report of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak GSKL 037/25/349 Yusuf Bujang, Mohd Zailon Ramli - 1999 - 6 p. ill.,map 30 cm

Includes bibliographical references

One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division


Hydrogeology--Sibu--Sarawak