Report of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak GSKL 037/25/349
Yusuf Bujang, Mohd Zailon Ramli
- 1999
- 6 p. ill.,map 30 cm
Includes bibliographical references
One 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division