Prospecting for bauxite in Sematan district - 2 p. 30 cm

Prospecting work wa carried out from 9th - 23rd May, 1981 and covered those areas which were left out during the first field-trip. A hand auger with a total penetration depth of 21 feet (6.4m) was used in the investigation work. A total of 17 samples were collected for analysis.


Bauxite--Sarawak


Sarawak