000 | 00425nam a22001217a 4500 | ||
---|---|---|---|
008 | 170313t1991 my 000 0 eng | ||
100 | _bEnggong Aji,Ajon Winnie | ||
245 | _aMineral clearance of the proposed Bakun hydroelectric project reservoir area Belaga Sarawak : RAK (E10 / E14) | ||
250 | _aJmg Sarawak | ||
260 |
_aIpoh Perak _bJabatan Penyiasatan Kajibumi Malaysia _c1991 |
||
300 | _aill:32p. 29.8 cm | ||
942 | _2ddc | ||
999 |
_c1163 _d1163 |