000 | 00677nam a2200157 4500 | ||
---|---|---|---|
001 | 0000001309 | ||
008 | 100829 my may | ||
020 | _cRM50.00 | ||
090 | 0 | 0 |
_a6222.12 _bZAI |
100 | 0 | _aZaidi Bin Daud | |
245 | 1 | 0 |
_aLaporan Bersepadu/Siap Projek, _bRancangan Malaysia Kelapan Projek Kajian Geobencana Negara Subprojek Kajian Kestabilan Cerun SarawakNo. Laporan: JMG. SWK.(GBN) 7/2005 _cZaidi Bin Daud |
260 |
_aKuching _bJabatan Mineral Dan Geosains, Malaysia Sarawak _c2005 |
||
300 |
_a<i-iip><1-27p> _bill(some colour), fig. tables, plates _c30.0cm |
||
504 | _aincludes attachment | ||
650 | 0 |
_aEngineering Geology _xTerrain Mapping _zSarawak _zMalaysia |
|
999 |
_c18691 _d18691 |