000 00711nam a2200157 4500
001 0000003270
008 121025 eng
040 _aJMG HQ
090 0 0 _a551.4959512332
_bMAL
110 2 _aMalaysian Soil Investigation Sdn. Bhd., 1981
245 1 0 _aReport on tubewell construction at Paloh Hinai Pekan, Pahang
_cMalaysian Soil Investigation Sdn. Bhd., 1981
260 _c1981
300 _aIv (various pagings)
_bill.
_c30 cm
520 _aThe aim of the project is to search for underground water for the comsumption of Paloh Hinai, Pekan. The work was carried out on instruction received from Jabatan Kerja Raya, Kuantan. One tubewell was constructed to a depth of 192'01''
650 0 _aHydrogeology
_zPekan
_zPahang
999 _c19230
_d19230