000 | 00730nam a2200157 4500 | ||
---|---|---|---|
001 | 0000003128 | ||
008 | 121010 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a555 _bTAN |
100 | 0 | _aTan, Y. N. | |
245 | 1 | 0 |
_aExploration and testing of construction materials for Batu Dam, Kuala Lumpur flood mitigation project _cY. N. Tan. |
260 | _c1979 | ||
300 |
_a10 p. _bill., maps _c30 cm. |
||
520 | _aThe area explored for the Batu Dam is approximately and upstream of the damsite within a distance of about1.80km, in the reservoir area. The general terrain of this area which covers also the valley floors of the Batu River and its tributary. The Tua River is moderately undulating. | ||
650 | 0 |
_aGeology investigation _zBatu Dam _zKuala Lumpur |
|
999 |
_c19386 _d19386 |