000 00699nam a2200157 4500
001 0000003243
008 121024 eng
040 _aJMG HQ
090 0 0 _a553.795952271
_bSUL
100 0 _aSulong Enjop
245 1 0 _aGroundwater investigation in hard rocks
_bexploration, drilling and construction of test well in Sebauh, Bintulu division, Sarawak
_cSulong Enjop
260 _c1992
300 _aiv, 41 p.
_bill.
_c30 cm. +
_e1 map
520 _aShort term pumping test was conducted on the first well to determine its yield and aquifer parameters. Test pumping was also conducted prior to installation of well in order to obtain an estimated yield from an aquifer
650 0 _aGroundwater
_zBintulu
_zSarawak
999 _c19489
_d19489