000 | 00699nam a2200157 4500 | ||
---|---|---|---|
001 | 0000003243 | ||
008 | 121024 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a553.795952271 _bSUL |
100 | 0 | _aSulong Enjop | |
245 | 1 | 0 |
_aGroundwater investigation in hard rocks _bexploration, drilling and construction of test well in Sebauh, Bintulu division, Sarawak _cSulong Enjop |
260 | _c1992 | ||
300 |
_aiv, 41 p. _bill. _c30 cm. + _e1 map |
||
520 | _aShort term pumping test was conducted on the first well to determine its yield and aquifer parameters. Test pumping was also conducted prior to installation of well in order to obtain an estimated yield from an aquifer | ||
650 | 0 |
_aGroundwater _zBintulu _zSarawak |
|
999 |
_c19489 _d19489 |