000 00793nam a2200169 4500
001 0000003441
008 121106 eng
040 _aJMG HQ
090 0 0 _a551.959521222
_bMAN
245 0 0 _aManagement report
_b(for departmental circulation only)
_nsheet 6/116/15
246 0 _aJoint Mapping Project Kinabalu Area, Sabah
260 _c1989
300 _a26 p.
_bmaps
_c30 cm.
504 _aIncludes bibliographical references
520 _aThe non-technical objective is to study the problems and viability of implementing the Joint Mapping Programme on a long term basis. The technical objectives are to map the target area systematically on a scale 1:50,000 and to carry out a reconnaissance geochemical survey to identify areas of possible mineralization
650 0 _aGeochemical
_zKinabalu
_zSabah
999 _c19653
_d19653