000 00725nam a2200181 4500
001 0000003438
008 121106 eng
040 _aJMG HQ
090 0 0 _a553.3095952262
_bENG
100 0 _aEnggong Aji
245 1 0 _aMineral clearance of the proposed Bakun hydroelectric project reservoir area, Belaga, Sarawak
_cEnggong Aji, Ajon Winnie
260 _c1991
300 _aiii, 29 p.
_bill.
_c30 cm+
_e5 maps
504 _aIncludes bibliographical references
520 _aThe main objective of the investigation was to assess the mineral potential of the area, before the area could be released for the implementation of the proposed hydroelectric project.
650 0 _aMineral industry
_zBelaga
_zSarawak
700 0 _aAjan Winnie
999 _c19719
_d19719