000 | 00842nam a2200205 4500 | ||
---|---|---|---|
001 | 0000003510 | ||
003 | OSt | ||
005 | 20230914153210.0 | ||
008 | 121108 eng | ||
040 |
_aJMG HQ _cJabatan Penyiasatan Kajibumi |
||
090 | 0 | 0 |
_a550.595114 _bAMS |
100 | 0 | _aAbd. Majid Sahat | |
245 | 1 | 0 |
_aBrief geological account of the Gopeng Dam, Perak : RAK (D3) _nreference no.: E(F)5/1990 _cby Abd. Majid Sahat |
260 | _c1990 | ||
300 |
_a1 v.(various pagings) _bill.,maps,photos _c30 cm. |
||
504 | _aIncludes bibliographical references | ||
520 | _aThe Drainage and Irrigation Department (DID) has set up a programme to monitor the safety of dams constructed by the department and the Geological Survey of Malaysia was commissioned to look into the geological aspects of the programme | ||
650 | 0 |
_aGeology _zGopeng _zPerak |
|
942 |
_2ddc _cRPT |
||
999 |
_c19807 _d19807 |