000 | 00718nam a2200169 4500 | ||
---|---|---|---|
001 | 0000003573 | ||
008 | 121109 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a555.595114 _bSHU |
100 | 1 | _aShu, Yeoh Khoon | |
245 | 1 | 0 |
_aFoundation investigation for the proposed field force camp in Kroh, Perak _nno. E(F)1/1976 _cShu Yeoh Khoon & Chow Weng Sum |
260 | _c1976 | ||
300 |
_a17 p. _bill.,photos _c30 cm |
||
520 | _aIn this respect the nature and volume of bedrock that need to be removed is critical to the overall cost estimate for the project and extensive programme of seismic survey was undertake to provide the necessary date for evaluation | ||
650 | 0 |
_aGeology investigation _zKroh _zPerak |
|
700 | 1 | _aChow, Weng Sum | |
999 |
_c19909 _d19909 |