000 00754nam a2200169 4500
001 0000003605
008 121109 eng
040 _aJMG HQ
090 0 0 _a550.595114
_bSAI
100 0 _aSaim Suratman
245 1 2 _aA preliminary geological report on the proposed Sg. Piah hydro-electric project Ulu Perak
_nno. E(f)3/1983
_cSalim Suratman
260 _c1983
300 _a24 p.
_bill.
_c30 cm +
_e2 maps
504 _aIncludes bibliographical references
520 _aThis report has been prepared as a geological reconnaissance survey of a proposed tunnel line for the Lembaga Letrik Negara Sg Piah hydro-electric project. The proposed tunnel line is approximately 16.5 km long and comprises 2 stages of diversion and power tunnels
650 0 _aGeology
_zPerak
999 _c19960
_d19960