000 | 00959nam a2200181 4500 | ||
---|---|---|---|
001 | 0000003989 | ||
008 | 121127 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a551.49592281 _bYUS |
100 | 0 | _aYusuf Bujang | |
245 | 1 | 0 |
_aReport of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak _nGSKL 037/23/(319) _cYusuf Bujang, Mohd. Zailon Ramli |
260 | _c1998 | ||
300 |
_a6 p. _bill., map _c30 cm |
||
504 | _aIncludes bibliographical references | ||
520 | _aA 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period | ||
650 | 0 |
_aHydrogeology _zMiri _zSarawak |
|
700 | 0 | _aMohd. Zailon Ramli | |
999 |
_c20512 _d20512 |