000 00959nam a2200181 4500
001 0000003989
008 121127 eng
040 _aJMG HQ
090 0 0 _a551.49592281
_bYUS
100 0 _aYusuf Bujang
245 1 0 _aReport of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak
_nGSKL 037/23/(319)
_cYusuf Bujang, Mohd. Zailon Ramli
260 _c1998
300 _a6 p.
_bill., map
_c30 cm
504 _aIncludes bibliographical references
520 _aA 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period
650 0 _aHydrogeology
_zMiri
_zSarawak
700 0 _aMohd. Zailon Ramli
999 _c20722
_d20722