000 | 00879nam a2200193 4500 | ||
---|---|---|---|
001 | 0000004213 | ||
008 | 121212 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a551.495952213 _bYUSsb |
100 | 0 | _aYusuf Bujang | |
245 | 1 | 0 |
_aReport of hydrogeological investigation at SRK Senibong, Lundu district, Kuching division, Sarawak _nGSKL 037/25/338 _cYusuf Bujang & Mohd. Zailon Ramli |
246 | 0 | _aRancangan Malaysia Ketujuh | |
260 | _c1998 | ||
300 |
_a8 p. _bill.,map _c30 cm |
||
504 | _aIncludes bibliographical references | ||
520 | _aA 8@ diameter tube well with dept 53 m into Kayan sandstone formation was able to discharge water at 2.1 m3/hr.This well was constructed by Geological Survey of Malaysia, Sarawak located at SRK Senibong, Lundu district as part of the projects under Seventh Malaysian Plan | ||
650 | 0 |
_aHydrogeology _zLundu _zSarawak |
|
700 | 0 | _aMohd. Zailon Ramli | |
999 |
_c20723 _d20723 |