000 | 00890nam a2200193 4500 | ||
---|---|---|---|
001 | 0000004210 | ||
008 | 121212 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a551.495952281 _bYUSkk |
100 | 0 | _aYusuf Bujang | |
245 | 1 | 0 |
_aReport of hydrogeological investigation at Kampung Kayu Kapur Sibuti, subdistrict Miri division, Sarawak _nGSKL 25/346 _cYusuf Bujang, Mohd Zailon Ramli |
246 | 0 | _aRancangan Malaysia Ketujuh | |
260 | _c1998 | ||
300 |
_a6 p. _bill.,map _c30 cm |
||
504 | _aIncludes bibliographical references | ||
520 | _aA 4@ diameter tube well with depth of 45.0 m into Sibuti Formation was able to discharge water at about 3.6 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak located at Kampung Kayu Kapur, Sibuti subdistrict as part of the project under Seventh Malaysian Plan | ||
650 | 0 |
_aHydrogeology _zMiri _zSarawak |
|
700 | 0 | _aMohd Zailon Ramli | |
999 |
_c20744 _d20744 |