000 | 00774nam a2200181 4500 | ||
---|---|---|---|
001 | 0000004211 | ||
008 | 121212 eng | ||
040 | _aJMG HQ | ||
090 | 0 | 0 |
_a551.495952251 _bYUSru |
100 | 0 | _aYusuf Bujang | |
245 | 1 | 0 |
_aReport of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak _nGSKL 037/25/349 _cYusuf Bujang, Mohd Zailon Ramli |
260 | _c1999 | ||
300 |
_a6 p. _bill.,map _c30 cm |
||
504 | _aIncludes bibliographical references | ||
520 | _aOne 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division | ||
650 | 0 |
_aHydrogeology _zSibu _zSarawak |
|
700 | 0 | _aMohd Zailon Ramli | |
999 |
_c20749 _d20749 |