000 00774nam a2200181 4500
001 0000004211
008 121212 eng
040 _aJMG HQ
090 0 0 _a551.495952251
_bYUSru
100 0 _aYusuf Bujang
245 1 0 _aReport of hydrogeological investigation at Rumah Ujeh, Pasai Sibu division, Sarawak
_nGSKL 037/25/349
_cYusuf Bujang, Mohd Zailon Ramli
260 _c1999
300 _a6 p.
_bill.,map
_c30 cm
504 _aIncludes bibliographical references
520 _aOne 4@ diameter tube well with total depth of 102 m into Belaga Formation was able to discharge water at 1.2 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Rumah Ujeh, Pasai, Sibu division
650 0 _aHydrogeology
_zSibu
_zSarawak
700 0 _aMohd Zailon Ramli
999 _c20749
_d20749