000 00879nam a2200241 4500
001 0000001824
008 110928
040 _aJMGHQ
090 0 0 _a555.95114
_bGAN
100 1 _aGan, Ah Sai
245 1 0 _aTanjong Malim (sheet 76)
_cby A.S. Gan, W.Y. LOke (GA) and D.S. Lim (GA).
260 _a[19?_]
300 _a2 v.
_bill. , maps, photos (b&w)
_c35 cm
505 0 _aV.1 Tanjong Malim (sheet 76)
505 0 _aV.2 Fieldwork : Day traverse of the oad cuttings from Tanjong malim to the Jabatan Parit dan Taliayer irrigation canal dam at Sungai Bernam, sheet 76.
650 0 _aSedimentary rocks
_zPerak
_zTanjong Malim
650 0 _aSedimentary rocks
_zTerengganu
_zBernam, Sungai
650 0 _aGeology
_zPerak
_zTanjong Malim
650 0 _aGeology
_zTerengganu
_zSungai, Bernam
651 0 _aTanjong Malim (Perak)
651 0 _aSungai Bernam (Terengganu)
700 1 _aLim, D.S
999 _c21298
_d21298