000 | 00868nam a2200193 4500 | ||
---|---|---|---|
001 | 0000001507 | ||
008 | 110914s1979 ab eng d | ||
040 | _aJMGHQ | ||
090 | 0 | 0 |
_a555.95112 _bYUN |
100 | 0 | _aYunus Abd. Razak | |
245 | 1 | 0 |
_aReconnaisance survey of sheet 9, Gubir area, Kedah, 21-29 October, 1979 _cYunus Abd. Razak, Chew Kim Huat, Rashid Ismail, Ahmad Fuad Ahmad |
260 | _c1979 | ||
300 |
_a173p. _bill., maps _c35 cm. |
||
520 | _aOnly Hutan Simpan Rimba Teloi and part of Hutan Simpan Terenas are excluded from the security area. These areas form about one-quater of the sheet. however, a special day to day permit was given by the authority to study road cutting along Gubir - Pedu Area | ||
650 | 0 |
_aGeology _zKedah _zGubir _xSurvey |
|
651 | 0 | _aGubir area (Kedah) | |
700 | 0 |
_aRashid Ismail _aAhmad Fuad Ahmad |
|
700 | 1 | _aChew, Kim Huat | |
999 |
_c21534 _d21534 |