000 | 00844nam a2200193 4500 | ||
---|---|---|---|
001 | 0000001914 | ||
008 | 110930 2006 eng d | ||
040 | _aJMGHQ | ||
090 | 0 | 0 |
_a553.5160959522 _bREN |
100 | 1 | _aRengga Anak Gendang | |
245 | 1 | 0 |
_aRancangan Malaysia Ketujuh-Kelapan Projek Sumber Mineral Perindustrian Sarawak _bsummary of limestone resources in Sarawak _cRengga Anak Gendang, Abdullah Sani b. H. Hashim, Dorani Johari. |
260 | _c2006 | ||
300 |
_a182 p. _bcol. ill., map _c30 cm |
||
520 | 3 | _aThe investigation of limestone resources in Sarawak was started in the Seventh Malaysia Plan and continued during the Eight Malaysian Plan as apart of Industrial Mineral Project. | |
650 | 0 |
_aGeology _zSarawak |
|
650 | 0 |
_aLimestone _zSarawak |
|
651 | 0 | _aSarawak | |
700 | 0 |
_aAbdullah Sani b. H. Hashim _aDorani Johari |
|
999 |
_c21821 _d21821 |