520 _aThe area containing the largest ore deposit is approximately 250' in length with an average width of two feet. The proven depth of ore is some 15' which is the amount disclosed by our clearing, trenching and by previous underground tunnels. Disregarding the 40 mineral content of the quartz, the ore weighs approximately 162 lbs per cubic foot, or 12.3 cubic foot per ton. Proven ore reserves them amount to 610 tons of ore. If is believed that the mineral content of the quartz will continue with depth. If we assume 100 of depth x 2 width x 250 in length, 4, 600 tons probable ore can be obtained.