000 00996nam a2200193 4500
001 0000002320
008 111007 1993 eng d
040 _aJMGHQ
090 0 0 _a553.410959522
_bTEN
100 0 _aTennent Ak Ahai
245 1 0 _aProgress report
_bplacer gold exploration project, middle Sungai Sarawak
_cTennent Ak Ahai, Victor Hon.
260 _c1993
300 _a19p.
_bill.
_c30cm
504 _aIncludes bibliographical references
520 _aA project to assess the placer gold potential of the Sungai Sarawak and Sungai Kayan drainage area was initiated in 1991 as a project under the Sixth Malaysia Plan (6MP). The reconnaissance phase covering about 360km2 of the two drainage basins is planned for completion in 1995. Up to 1993 fieldwork in the Upper Sungai Sarawak Kanan and Middle Sungai Sarawak has been completed with a total coverage of 100km2.
650 0 _aMinerals
_zSarawak
_zSungai Sarawak
651 0 _aSungai Sarawak (Sarawak)
700 1 _aHon, Victor
999 _c21883
_d21883