000 01168nam a2200193 4500
001 0000002810
008 111108
040 _aJMGHQ
090 0 0 _a555.95119
_bCHO
100 1 _aChow, Weng Sum
245 1 0 _aQuarry site investigation at Gunong Muntahak Kota Tinggi, Johore
_cChow Weng Sum, Hew Kiang Tho.
260 _c1977
300 _a5p.
_bill., photos (b & w)
_c30cm
520 _aThe proposed quarry site is accessible from Kota Tinggi by a metalled road (the Kota Tinggi-Mersing Highway) which runs in the north to northwest direction. At the 13 1/2th mile from Kota Tinggi, an all weather laterite road runs in the westerly direction for 8 miles to a worked-out, abandoned tin mine area. This laterite road continues to run in a generally westerly direction beyond this worked-out mine area. At a point about 1 1/2 miles from the worked-out tin mine area, a rentise line (small path) about 1/4 mile long was cut in the southerly direction to the foot of the proposed quarry site.
650 0 _aSeismic survey
_zJohor
_zGunong Muntahak
650 0 _aGeology
_zJohor
_zGunong Muntahak
651 0 _aGunong Muntahak (Kota Tinggi, Johor)
700 1 _aHew, Kiang Tho
999 _c22765
_d22765