000 01096nam a2200229 4500
001 0000002702
008 111028 1986 eng d
040 _aJMGHQ
090 0 0 _a555.951214
_bVIJ
100 1 _aVijayan, V.R
245 1 0 _aSiesmic refraction survey in the proposed saddle dam area of the Nenggiri Dam Project near Gua Muasang, kelantan
_cV.R. Vijayan, Jamaludin Othman.
260 _c1986
300 _aiii, 39 p.
_bill., maps
_c29 cm
504 _aIncludes bibliographical references
520 _aThe main objective of the survey is to investigate the continuity and thickness of the overbuden above the limestone formation. A total of 10 seismic lines with a coverage of 4.27 km. and consisting of 3 longitudinal lines running in a north - south direction and 7 cross-lines trending east-west was surveyed.
650 0 _aGeology
_zKelantan
_zGua Musang
650 0 _aLimestone
_zKelantan
_zGua Musang
650 0 _aSeismic Surveys
_zKelantan
_zGua Musang
650 0 _aWater-supply
_zKelantan
_zGua Musang
651 0 _aGua Musang (Kelantan)
700 0 _aJamaludin Othman
999 _c22779
_d22779