245 | 0 | 0 | _aProspecting for bauxite in Sematan district |
300 |
_a2 p. _c30 cm |
||
520 | _aProspecting work wa carried out from 9th - 23rd May, 1981 and covered those areas which were left out during the first field-trip. A hand auger with a total penetration depth of 21 feet (6.4m) was used in the investigation work. A total of 17 samples were collected for analysis. | ||