000 00667nam a2200181 4500
001 0000001753
008 110923
040 _aJMGHQ
090 0 0 _a553.3095951234
_bSUM
100 1 _aSummers, B.
245 1 0 _aRomping Mining Co. Ltd.
_biron ore accurrences at Bukit Holong & Ulu Chepai
_cB. Summers.
260 _c1962
300 _a3 p.
_c34 cm
520 _aIn early 1962 the Company carried out prospecting operations in an area known as Bukit Holong, to the west of Bukit Sembilan range. Prospecting included geological mapping, magnetometer survey, pitting diamond drilling.
610 0 _aRompin Mining Co. Ltd.
650 0 _aIron ore
_zPahang
651 0 _aPahang
999 _c22916
_d22916