000 | 00781nam a2200181 4500 | ||
---|---|---|---|
001 | 0000002923 | ||
008 | 111205 1982 eng d | ||
040 | _aJMGHQ | ||
090 | 0 | 0 |
_a551.4360959522 _bSUL |
100 | 1 | _aSullang, J. | |
245 | 1 | 0 |
_aQuarry site investigation Bukit Jemurang, Pantun 2nd Division _cby J. Sullang |
260 | _c1982 | ||
300 |
_a3p. _bill.,maps _c30cm |
||
520 | _aThe purpose of the site investigation was to determine the quality a stone available in the area for use as roadstone and other engineering purpose and also to study the viablity of the site for the setting up of a quarry | ||
650 | 0 |
_aQuarries and quarrying _zBetong _zJemurang, Bukit |
|
650 | 0 |
_aGeology _zSarawak _zBetong _zJemurang, Bukit |
|
651 | 0 | _aJemurang,Bukit(Betong,Sarawak) | |
999 |
_c23219 _d23219 |