000 | 00824nam a2200169 4500 | ||
---|---|---|---|
001 | 0000002964 | ||
008 | 111206 1995 eng d | ||
040 | _aJMGHQ | ||
090 | 0 | 0 |
_a555.9522 _bAHA |
100 | 0 | _aAbdul Hadi Abdul Rahman | |
245 | 1 | 0 |
_aProgress report _bregional geological mapping of the Bukit Garam area,Sarawak _cAbdul Hadi Abdul Rahman |
260 | _c1995 | ||
300 |
_a1v(unnumbered) _bill,maps _c30cm |
||
520 | _aArea surveyed is located in the Bukit Garam area with comprises about 870km2,covering the whole map sheet 2/112/4.Fieldwokwas started in April 1995 and finished in November 1995.Objectives of the project is to survey and locating the rock formation of the area and also their mineral potential and structures observed | ||
650 | 0 |
_aGeology _zSarawak |
|
650 | 0 |
_aGeological mapping _zSarawak |
|
999 |
_c23339 _d23339 |