000 | 00611nam a2200157 4500 | ||
---|---|---|---|
001 | 0000004747 | ||
090 | 0 | 0 |
_a624.151 _bZAD |
100 | 1 | _aZaidi bin Daud | |
245 | 1 | 1 |
_aLaporan Geologi Kejuruteraan, Kg. Lereng Bukit, Bukit Kanada, Miri, Sarawak _bRMKe-9: Projek Kajian Geobencana Negara _cZaidi bin Daud |
260 |
_aSarawak Kementerian Sumber Asli dan Alam Sekitar _cJMG(Sarawak) |
||
300 |
_av, 28ms _bill, col, photo, graf, maps, table _c130cm |
||
500 | _aRujukan Bibliografi ms28, Peta disediakan | ||
650 | 0 |
_aGeology _zSarawak |
|
650 | 0 |
_aNatural Disaster _zMiri |
|
650 | 0 |
_aGeological Engineering _zSarawak |
|
999 |
_c23481 _d23481 |