000 | 00682nam a22001697a 4500 | ||
---|---|---|---|
001 | 0000000603 | ||
003 | OSt | ||
005 | 20240115145833.0 | ||
008 | 230414b ||||| |||| 00| 0 eng d | ||
040 | _cPusat Penyeldikan Mineral, Jabatan Mineral Dan Geosains Malaysia | ||
100 | _eAbdul Rois b. Abdul Mois | ||
245 |
_aLaporan PPM R012/2010: Laporan Kesesuaian Selut Hampas Lombong Timah Sebagai Bahan Komponen Tambahan Dalam Jasad Lempung Sayong, April 2010 _cAbdul Rois b. Abdul Mois |
||
260 |
_aPerak _bPusat Penyeldikan Mineral, Jabatan Mineral Dan Geosains Malaysia _c2010 |
||
300 |
_a9 p. _bill.; some col. graf _c29 cm |
||
700 | _dKori b. Muhammad | ||
942 |
_2ddc _cRPT |
||
999 |
_c24925 _d24925 |