Kueh, Khai Soon
Brick clay site investigation in the Sungai Bakong area, Meradong district, Bintangor, Sarikei district, Sarawak ref: GSKL 039/9/(207) Kueh Khai Soon - 1992 - ii, 12 p. ill.,maps 30 cm
Hand augering using the bi-partite Edelman Clay Auger was conducted in a grid pattern at 50 m. intervals. A total of 6 holes were augered and logged.
Clay--Sarikei--Sarawak
Brick clay site investigation in the Sungai Bakong area, Meradong district, Bintangor, Sarikei district, Sarawak ref: GSKL 039/9/(207) Kueh Khai Soon - 1992 - ii, 12 p. ill.,maps 30 cm
Hand augering using the bi-partite Edelman Clay Auger was conducted in a grid pattern at 50 m. intervals. A total of 6 holes were augered and logged.
Clay--Sarikei--Sarawak