Che Aziz Che Soh
Reassessment of the stone reserve at KM 67 (Mile 42) Bintulu - Miri Road, Bintulu Division / Ruj.: GSKL.017/19/384 / Che Aziz Che Soh, Mohd Azhar Abdullah - Kuching : Jabatan Penyiasatan Kajibumi Malaysia, 1997 - ii, 11 p. : ill. ; 30 cm.
Includes bibliographical references.
An investigation into the stone potential for quarrying at KM 67, Bintulu - Miri Road is conducted to reassess the suitability and quantity of the area for use as roadstone and for other constructional purposes.
Mineral Perindustrian --Sarawak--Bintulu Division
Reassessment of the stone reserve at KM 67 (Mile 42) Bintulu - Miri Road, Bintulu Division / Ruj.: GSKL.017/19/384 / Che Aziz Che Soh, Mohd Azhar Abdullah - Kuching : Jabatan Penyiasatan Kajibumi Malaysia, 1997 - ii, 11 p. : ill. ; 30 cm.
Includes bibliographical references.
An investigation into the stone potential for quarrying at KM 67, Bintulu - Miri Road is conducted to reassess the suitability and quantity of the area for use as roadstone and for other constructional purposes.
Mineral Perindustrian --Sarawak--Bintulu Division