Yusuf Bujang
Report of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak GSKL 037/23/(319) Yusuf Bujang, Mohd. Zailon Ramli - 1998 - 6 p. ill., map 30 cm
Includes bibliographical references
A 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period
Hydrogeology--Miri--Sarawak
Report of hydrogeological investigation at Kpg. Butir, Bekenu, Miri division, Sarawak GSKL 037/23/(319) Yusuf Bujang, Mohd. Zailon Ramli - 1998 - 6 p. ill., map 30 cm
Includes bibliographical references
A 6'' diameter tube well with depth 95.7m into Lambir Formation was able to discharge water at about 1.0 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak, located at Kpg. Butir, Bekenu as part of the projects under Seventh Malaysian Plan. The tube well was later converted into use for the people at Kpg. Butir or as a supplement source for the Sg. Kejapil during the low flow period
Hydrogeology--Miri--Sarawak