Yusuf Bujang
Report of hydrogeological investigation at Kampung Kayu Kapur Sibuti, subdistrict Miri division, Sarawak GSKL 25/346 Rancangan Malaysia Ketujuh Yusuf Bujang, Mohd Zailon Ramli - 1998 - 6 p. ill.,map 30 cm
Includes bibliographical references
A 4@ diameter tube well with depth of 45.0 m into Sibuti Formation was able to discharge water at about 3.6 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak located at Kampung Kayu Kapur, Sibuti subdistrict as part of the project under Seventh Malaysian Plan
Hydrogeology--Miri--Sarawak
Report of hydrogeological investigation at Kampung Kayu Kapur Sibuti, subdistrict Miri division, Sarawak GSKL 25/346 Rancangan Malaysia Ketujuh Yusuf Bujang, Mohd Zailon Ramli - 1998 - 6 p. ill.,map 30 cm
Includes bibliographical references
A 4@ diameter tube well with depth of 45.0 m into Sibuti Formation was able to discharge water at about 3.6 m3/hr. This well was constructed by Geological Survey of Malaysia, Sarawak located at Kampung Kayu Kapur, Sibuti subdistrict as part of the project under Seventh Malaysian Plan
Hydrogeology--Miri--Sarawak