Construction of exploratory bore hole at Kg. Kolek and Panching and Sg. Lembing.
- 1983
- 1 v. (unnumbered) ill. 30 cm
The work involves the drilling of 5 exploratory boreholes to depth ranging fom 15' 0@ to 100' 0@. The work was carried out on instruction received from Jabatan Kerja Raya.
Geology--Pahang
Construction--Pahang
Rockfalls--Pahang
Kg. Kolek (Pahang)
Sg. Lembing (Pahang)
The work involves the drilling of 5 exploratory boreholes to depth ranging fom 15' 0@ to 100' 0@. The work was carried out on instruction received from Jabatan Kerja Raya.
Geology--Pahang
Construction--Pahang
Rockfalls--Pahang
Kg. Kolek (Pahang)
Sg. Lembing (Pahang)