Chow, Weng Sum
Quarry site investigation at Gunong Muntahak Kota Tinggi, Johore Chow Weng Sum, Hew Kiang Tho. - 1977 - 5p. ill., photos (b & w) 30cm
The proposed quarry site is accessible from Kota Tinggi by a metalled road (the Kota Tinggi-Mersing Highway) which runs in the north to northwest direction. At the 13 1/2th mile from Kota Tinggi, an all weather laterite road runs in the westerly direction for 8 miles to a worked-out, abandoned tin mine area. This laterite road continues to run in a generally westerly direction beyond this worked-out mine area. At a point about 1 1/2 miles from the worked-out tin mine area, a rentise line (small path) about 1/4 mile long was cut in the southerly direction to the foot of the proposed quarry site.
Seismic survey--Johor--Gunong Muntahak
Geology--Johor--Gunong Muntahak
Gunong Muntahak (Kota Tinggi, Johor)
Quarry site investigation at Gunong Muntahak Kota Tinggi, Johore Chow Weng Sum, Hew Kiang Tho. - 1977 - 5p. ill., photos (b & w) 30cm
The proposed quarry site is accessible from Kota Tinggi by a metalled road (the Kota Tinggi-Mersing Highway) which runs in the north to northwest direction. At the 13 1/2th mile from Kota Tinggi, an all weather laterite road runs in the westerly direction for 8 miles to a worked-out, abandoned tin mine area. This laterite road continues to run in a generally westerly direction beyond this worked-out mine area. At a point about 1 1/2 miles from the worked-out tin mine area, a rentise line (small path) about 1/4 mile long was cut in the southerly direction to the foot of the proposed quarry site.
Seismic survey--Johor--Gunong Muntahak
Geology--Johor--Gunong Muntahak
Gunong Muntahak (Kota Tinggi, Johor)