Seismic refraction survey for the Chenderoh Dam rehabilitation study (RAK F3) (Record no. 1620)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00598nam a2200121 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180515t1986 my 000 0 eng |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Numeration | Jamaludin b Othman ,Dzazali b Ayub, sukri b Ghazali |
245 ## - TITLE STATEMENT | |
Title | Seismic refraction survey for the Chenderoh Dam rehabilitation study (RAK F3) |
250 ## - EDITION STATEMENT | |
Edition statement | GF 3/1986 |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Ipoh Perak |
Name of publisher, distributor, etc. | Jabatan Penyiasatan Kajibumi Malaysia |
Date of publication, distribution, etc. | 1986 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ill:24p. 29.8 cm |
Accompanying material | Figure 5: Bedrock Depth Contours of Downstream Chenderoh Dam Seismic Profiles of lines cs 13,16,8,19,Seismic profiles of lines cs,22,8,25,Seismic profiles of lines cs ,4,7,8,10, |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme |
Withdrawn status | Lost status | Source of classification or shelving scheme | Materials specified (bound volume or other part) | Damaged status | Not for loan | Permanent Location | Current Location | Shelving location | Date acquired | Inventory number | Total Checkouts | Full call number | Date last seen | Copy number | Price effective from |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Available | RAK F3 | BPT | BPT | Field Report | 25/11/2024 | GF 3/1986 ( 00358) | C 550 JAM | 25/11/2024 | 01 | 25/11/2024 | |||||
Available | RAK F3 | BPT | BPT | Field Report | 25/11/2024 | GF 3/1986 ( 00358) | C 550 JAM | 25/11/2024 | 02 | 25/11/2024 |