Exploration and testing of construction materials for Batu Dam, Kuala Lumpur flood mitigation project (Record no. 19386)

000 -LEADER
fixed length control field 00730nam a2200157 4500
001 - CONTROL NUMBER
control field 0000003128
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 121010 eng
040 ## - CATALOGING SOURCE
Original cataloging agency JMG HQ
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) 555
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN) TAN
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Tan, Y. N.
245 10 - TITLE STATEMENT
Title Exploration and testing of construction materials for Batu Dam, Kuala Lumpur flood mitigation project
Statement of responsibility, etc. Y. N. Tan.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 1979
300 ## - PHYSICAL DESCRIPTION
Extent 10 p.
Other physical details ill., maps
Dimensions 30 cm.
520 ## - SUMMARY, ETC.
Summary, etc. The area explored for the Batu Dam is approximately and upstream of the damsite within a distance of about1.80km, in the reservoir area. The general terrain of this area which covers also the valley floors of the Batu River and its tributary. The Tua River is moderately undulating.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Geology investigation
Geographic subdivision Batu Dam
-- Kuala Lumpur
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
Available       Open Shelf JMG IBUPEJABAT JMG IBUPEJABAT Open Shelf 23/05/2019   555 TAN 0000004689 23/05/2019 23/05/2019 Reports