Report on the iron ore deposits of Ulu Rompin, Pahang, April, May, 1941 (Record no. 23105)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01377nam a2200181 4500 |
001 - CONTROL NUMBER | |
control field | 0000002809 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 111108 1941 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | JMGHQ |
090 00 - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | 553.30959512341 |
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN) | FIT |
100 1# - MAIN ENTRY--PERSONAL NAME | |
Personal name | Fitch, F. H. |
245 10 - TITLE STATEMENT | |
Title | Report on the iron ore deposits of Ulu Rompin, Pahang, April, May, 1941 |
Statement of responsibility, etc. | F. H. Fitch. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Date of publication, distribution, etc. | 1941 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 10p. |
Dimensions | 33cm |
520 ## - SUMMARY, ETC. | |
Summary, etc. | A geological examination of the deposit was made during April and May 1941, the results of which are summarized below; (a)Ore reserves of between 20,000,000 and 30,000,000 tons have been satisfactorily proved by the I.S.K. (b)Further workable bodies of ore would probably be revealed during the exploitation of proved reserves. (c)Geophysical prospecting by magnetic methods would be an ideal way of searching for hidden deposits in the same area. (d)Transportation of the ore to ocean-going ships is a serious problem. The I.S.K. estimate that a railway would cost about |
Materials specified | ,500,000 and would take three years to build. (e)The iron ore occurs as veins in sheared quartz porphyry, trending with the direction of shearing. (f)The iron was probably concentrated from an epidoterich granite which was intruded into the quartz-porphyry and surrounding sedimentary rocks. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Mineral industries |
Geographic subdivision | Pahang |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Iron ore |
General subdivision | Geology |
Geographic subdivision | Pahang |
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME | |
Geographic name | Ulu Rompin (Pahang) |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Permanent Location | Current Location | Shelving location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Available | Open Shelf | JMG IBUPEJABAT | JMG IBUPEJABAT | Open Shelf | 23/05/2019 | 553.30959512341 FIT | 00003776 | 23/05/2019 | 23/05/2019 | Reports |