Laporan PPM R002/2015: Progress Report Of Pilot Plant Of Passive Treatment System For Ex-Mamut Copper Mine, October 2014 (Record no. 24171)

000 -LEADER
fixed length control field 00772nam a22001697a 4500
001 - CONTROL NUMBER
control field 0000000041
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20231219152756.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 201102b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geossains Malaysia
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term Dr. Shamsul Kamal Bin Sulaiman
245 ## - TITLE STATEMENT
Title Laporan PPM R002/2015: Progress Report Of Pilot Plant Of Passive Treatment System For Ex-Mamut Copper Mine, October 2014
Statement of responsibility, etc. Dr. Shamsul Kamal Bin Sulaiman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Ipoh, Perak
Name of publisher, distributor, etc. Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent 17 p.
Other physical details ill, col, photo, table
Dimensions 29 cm
700 ## - ADDED ENTRY--PERSONAL NAME
Relator term Norinsafarina Bt. Mustaffa Kamal, Mohd Shafreen b.Mad Isa, Mohd Syahrir b. Mohd Rozi, Fatihah bt Azmi
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Reports
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Total Checkouts Date last seen Price effective from Koha item type
Available         PPM PPM Report 03/11/2022   03/11/2022 03/11/2022 Reports