Laporan PPM R008/2020: Rancangan Malaysia Kesebelas (RMKe-11) Penghasilan Jubin Kaca Seramik Daripada Batuan Silika, Borax Dan Bentonit, November 2020 (Record no. 24282)

000 -LEADER
fixed length control field 00728nam a22001697a 4500
001 - CONTROL NUMBER
control field 0000000165
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240717124430.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210105b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term Mohd Idham b. Mustaffar
245 ## - TITLE STATEMENT
Title Laporan PPM R008/2020: Rancangan Malaysia Kesebelas (RMKe-11) Penghasilan Jubin Kaca Seramik Daripada Batuan Silika, Borax Dan Bentonit, November 2020
Statement of responsibility, etc. Mohd Idham b. Mustaffar
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Perak
Name of publisher, distributor, etc. Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
Date of publication, distribution, etc. 2020
300 ## - PHYSICAL DESCRIPTION
Extent 20 p.
Other physical details ill, col, photo
Dimensions 29 cm
700 ## - ADDED ENTRY--PERSONAL NAME
Relator term Syarifah Aminah Bt. Ismail, Mohamad Haniza Bin Mahmud
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Reports
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Total Checkouts Date last seen Price effective from Koha item type
Available         Report PPM PPM Report 17/07/2024   17/07/2024 17/07/2024 Reports