Laporan PPM R019/2014: Laporan Kajian Penghasilan Kalsium Karbonat Termendak (PCC) Menggunakan Kaedah Penyemburan, Disember 2014 (Record no. 24414)

000 -LEADER
fixed length control field 00684nam a22001697a 4500
001 - CONTROL NUMBER
control field 0000000248
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240719090022.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210414b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term Anuar b. Othman
245 ## - TITLE STATEMENT
Title Laporan PPM R019/2014: Laporan Kajian Penghasilan Kalsium Karbonat Termendak (PCC) Menggunakan Kaedah Penyemburan, Disember 2014
Statement of responsibility, etc. Anuar b. Othman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Perak
Name of publisher, distributor, etc. Pusat Penyelidikan Mineral, Jabatan Mienral Dan Geosains Malaysia
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent iii, 19 p.
Other physical details ill, col., photo
Dimensions 29 cm
700 ## - ADDED ENTRY--PERSONAL NAME
Relator term Nasharuddin b. Isa, Dr. Rohaya bt. Othman
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Reports
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Total Checkouts Date last seen Price effective from Koha item type
Available         Report PPM PPM Report 19/07/2024   19/07/2024 19/07/2024 Reports