Laporan PPM R003/2009: Penentuan Parameter Bagi Proses Pensintesisan Kalsiun Karbonat Termendak (PCC) Menggunakan Reaktor Prototaip April 2009 (Record no. 24913)

000 -LEADER
fixed length control field 00706nam a22001697a 4500
001 - CONTROL NUMBER
control field 0000000473
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240122155752.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230413b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
100 ## - MAIN ENTRY--PERSONAL NAME
Relator term Abd Rahman b. Abd Aziz
245 ## - TITLE STATEMENT
Title Laporan PPM R003/2009: Penentuan Parameter Bagi Proses Pensintesisan Kalsiun Karbonat Termendak (PCC) Menggunakan Reaktor Prototaip April 2009
Statement of responsibility, etc. Abd Rahman b. Abd Aziz
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Perak
Name of publisher, distributor, etc. Pusat Penyelidikan Mineral, Jabatan Mineral Dan Geosains Malaysia
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent 13 p.
Other physical details ill.; some col., table
Dimensions 29 cm
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Reports
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Total Checkouts Date last seen Price effective from Koha item type
Available         PPM PPM Report 13/04/2023   13/04/2023 13/04/2023 Reports