A Case History - Comparison And Correlation Of Seismic Results With Driling Data Of The Seismic survey At The Proposed Jalan Bayan Lepas - Sungai Ara ,Penang. (F3) (Record no. 25907)

000 -LEADER
fixed length control field 00445nam a22001097a 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 241115b 00| i eng
245 ## - TITLE STATEMENT
Title A Case History - Comparison And Correlation Of Seismic Results With Driling Data Of The Seismic survey At The Proposed Jalan Bayan Lepas - Sungai Ara ,Penang. (F3)
250 ## - EDITION STATEMENT
Edition statement E(S) 1A /1976
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. KUALA LUMPUR
Name of publisher, distributor, etc. Jabatan Penyiasatan Kajibumi Malaysia
Date of publication, distribution, etc. 1976
300 ## - PHYSICAL DESCRIPTION
Extent ill:20p. 32.21cm
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme

No items available.