PROJEK : KERJA BAIK PULIH DI LUAR STESEN JANAELEKTRIK SULTAN MAHMUD (SJSM), KENYIR, TERENGGANU : PEMETAAN GEOLOGI DAN PENILAIAN BENCANA GEOLOGI : NO. TENDER: JMGHQ32080101-001-20 : FINAL REPORT 2024 (Record no. 27051)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 00611nam a22001337a 4500 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 251226b ||||| |||| 00| 0 eng d |
| 082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER | |
| Classification number | 624.151 |
| 245 00 - TITLE STATEMENT | |
| Title | PROJEK : KERJA BAIK PULIH DI LUAR STESEN JANAELEKTRIK SULTAN MAHMUD (SJSM), KENYIR, TERENGGANU : PEMETAAN GEOLOGI DAN PENILAIAN BENCANA GEOLOGI : NO. TENDER: JMGHQ32080101-001-20 : FINAL REPORT 2024 |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Putrajaya : |
| Name of publisher, distributor, etc. | Jabatan Mineral dan Geosains Malaysia, |
| Date of publication, distribution, etc. | 2025 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | 292 pages : |
| Other physical details | photographs, colour maps ; |
| Dimensions | 30 cm |
| 650 10 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| General subdivision | Engineering geology |
| 650 20 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| General subdivision | Geological mapping |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | |
| Edition | 22 |
| Classification part | 624.151 |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Permanent Location | Current Location | Shelving location | Date acquired | Total Checkouts | Full call number | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Available | JMG IBUPEJABAT | JMG IBUPEJABAT | Open Shelf | 26/12/2025 | 624.151 PRO | 26/12/2025 | 5 | 26/12/2025 | Reports |