Laporan kerja penggerudian, pembinaan dan pengujian telaga tiub di RH Saran, RH Duau, RH Mawar dan RH Chabu, Bahagian Sibu, Sarawak : RAK (E8) (Record no. 483)

000 -LEADER
fixed length control field 00591nam a2200121 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 160906t2008 my 000 0 m
100 ## - MAIN ENTRY--PERSONAL NAME
Numeration Nik Mohd Nishamuddin bin Nik Rahimi; Mohamad Zahir Che Amad dan Yusuf Bujang
245 ## - TITLE STATEMENT
Title Laporan kerja penggerudian, pembinaan dan pengujian telaga tiub di RH Saran, RH Duau, RH Mawar dan RH Chabu, Bahagian Sibu, Sarawak : RAK (E8)
250 ## - EDITION STATEMENT
Edition statement RMK 11 (2006 - 2010). Projek Kajian Sumber Air Tanah Negara.-
Remainder of edition statement JMG.SWK (HG) 02/2008
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuala Lumpur:
Name of publisher, distributor, etc. Jabatan Mineral dan Geosains Malaysia,
Date of publication, distribution, etc. 2008
300 ## - PHYSICAL DESCRIPTION
Extent ill. 13 p., 29.8 cm
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Cost, normal purchase price Total Checkouts Date last seen Price effective from Koha item type
Available         BPT BPT General Stacks 06/09/2016 50.00   06/09/2016 06/09/2016 Books